Step 1: Load Profile
Define your power needs and backup duration
Quick Presets
Tip: For whole-home backup, check your main breaker rating. A 200A panel at 240V = 48 kW max, but typical concurrent draw is 20–40%.
Define your power needs and backup duration
Quick Presets
Tip: For whole-home backup, check your main breaker rating. A 200A panel at 240V = 48 kW max, but typical concurrent draw is 20–40%.